Date:  6-4-2010
Number of Hours:  2.00
Manual Reference:  Page 6-8
Brief Description:  Construction continues on the right elevator

After the stiffeners were back riveted on the right elevator, the trailing edge was bent in the home made bender. A couple of bending stages and the required bend was achieved so that the leading edges sat on the spar.

Onto the sub structure.